Drill jig for a composite access panel
BriefHole pattern on a composite panel was being marked by hand, costing two hours per unit and producing scrap on mis-drills.
What we printedPrinted a two-piece PA-CF jig with hardened drill bushings pressed into printed seats, keyed to the panel edge datum.
- Material
- PA-CF
- Tolerance
- ±0.15 mm on bushing centres
- Lead time
- 31 h from STL to dispatch
Mark-up time cut from 120 min to 9 min per panel; mis-drill scrap eliminated across a 240-unit run.