DefenceField-ready parts, no import lead time.

Defence programmes need parts that survive handling, heat and field abuse — and a supply chain inside the country. We print ruggedised polymer housings, frames and station fixtures under NDA from a single automated roof in Surat.

Lead time
48–96 h depending on classification review
Typical tolerance
±0.2 mm typical
Process
FDM · ASA · PC
/ WHAT WE FIX

The three things that slow defence down.

01

Sovereign supply

All production is domestic. No export licence friction, no offshore data handling.

02

Confidentiality

Uploads are gated behind a counter-signed NDA and scoped to your account only.

03

Low-volume spares

One-off and 5-off runs are priced the same way as batches — no minimum order tooling cost.

/ TYPICAL PARTS
  • ▸Electronics and sensor housings
  • ▸UAV airframes and payload bays
  • ▸Weapon-station and range fixtures
  • ▸Field maintenance tooling
  • ▸Training and mock-up hardware
/ MATERIAL CALLS
ASA

Outdoor stable, impact tough, UV resistant.

PC

Highest impact and heat tolerance in the FDM catalogue.

PA-CF

Lightweight stiffness for airframe structure.

/ HANDLING
  • Counter-signed NDA
  • Access-scoped job records
  • Domestic-only production
/ CASE STUDIES

Jobs we have already run in defence.

DPSU maintenance depot

Ruggedised sensor housing, low-volume spare

BriefHousing for a legacy sensor was out of supply; the original vendor's minimum order was 500 units.

What we printedScan-to-print reconstruction, printed in ASA with reinforced boss walls and captive-nut pockets.

Material
ASA
Tolerance
±0.2 mm
Lead time
72 h including classification review

12 spares supplied against a requirement of 12 — no minimum-order penalty, fully domestic supply chain.

Defence integrator (NDA)

Range fixture for weapon-station calibration

BriefCalibration fixture had to survive outdoor range use and repeated clamping.

What we printedPC body with linear supports, 5 wall loops and 75 % infill at the clamp interfaces only.

Material
PC
Tolerance
±0.2 mm
Lead time
48 h

Fixture completed a full range season without deformation; replaced a fabricated steel item at a fifth of the cost.

Drop the STL. Get a firm price in minutes.

no RFQ cycle, no phone tag.

Start a job →
/ OTHER SECTORS